
Industrial
Wainuiomata Geothermal — Stack Maintenance Access
Contact Energy
Engineered access scaffold to 28m for planned shutdown maintenance on a geothermal exhaust stack. Mobilised in 48 hours to hit the outage window.

Case Studies
A selection of recent work for the Greater Wellington region's biggest names in industry, construction and events.

Industrial
Contact Energy
Engineered access scaffold to 28m for planned shutdown maintenance on a geothermal exhaust stack. Mobilised in 48 hours to hit the outage window.

Civil
Fulton Hogan
Suspended scaffold under a state highway bridge for blasting and re-coating. Full road-corridor traffic management plan.

Event
Ironman NZ
Engineered grandstands, camera platforms and finish-line structures. Installed, certified and struck inside a 5-day window.

Residential
Penny Homes
Rolling perimeter scaffold programme for a major Wellington region home builder — 48h turnaround per house.

Shrink Wrap
Bay Decorators
Full weather-tight shrink wrap enclosure for façade re-painting of a heritage commercial building. Engineer-signed wind loading.

Industrial
Red Stag Timber
Birdcage and propping scaffold for kiln maintenance access. Coordinated around 24/7 production cycles.
Want a reference for your sector?
Ask for a Referee